Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the energysaver domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/clients/client1/web4/web/wp-includes/functions.php on line 6121
Facturation (Water/Garbage) - Walferdange

Facturation (Water/Garbage)

Three ‘water/garbage’ bills are issued in a year for each customer. For the first billing period (January to April) and the third billing period of a year (September to December) the bills are based on an estimate of the previous year’s water consumption. The bill is issued in the second billing period, which includes the months of May to August, when the water meters are read.

You will need Adobe Reader or compatible software to use the forms in PDF format. Click on this link to download Adobe Reader for free.

Full fee regulations – coordinated text (FR)

Règlement taxes intégral – texte coordonné